Pre-handover cleaning is a different discipline from standard post-construction cleaning — it's cleaning the property to its highest possible presentation standard while simultaneously identifying anything that needs correction before the owner takes possession. A developer who hands over a property where a skilled cleaning team found and documented twelve defects during the clean is in a far better position than one who discovers the same defects after the owner has moved in and formed a negative first impression. We provide defect documentation as a standard output of all pre-handover cleaning engagements — not as an add-on, but as a natural output of the level of attention the clean involves.
Handover Clean Services
Full Clean to Handover Standard
Complete cleaning of all areas to the standard required for property handover. Every surface, inside every cabinet, every light fitting, every floor drain, all glass and window tracks. The most thorough clean scope — not abbreviated to meet a cost target.
Defect Documentation
During the clean, our team documents items requiring attention before handover: paint touch-ups needed, incomplete grout, tile chips, hardware issues, items not functioning correctly. Delivered as a WhatsApp photo report alongside cleaning completion — a clear documented list for the builder's snag response.
Presentation Staging
After cleaning, basic staging for handover photography or owner inspection — positioning of any furniture or decorative items already on site, ensuring all surfaces are camera-ready, confirming pool and garden areas are presentable. Available as an additional service for properties where photography or a formal handover inspection is planned.
Re-Clean Before Occupation
For properties where there's a gap between handover clean and actual occupation — common in Bali where construction completes and occupation or first guests arrive weeks later — a light re-clean removes accumulated dust before first use. Significantly less intensive than the handover clean; priced accordingly.
How the Handover Clean Works
A pre-handover clean is two jobs at once: bringing the property to its highest presentation standard, and creating a clear record of anything the builder still needs to fix. We run it as a structured process so nothing is missed before the owner takes keys.
1. Full Presentation Clean
Every surface, inside every cabinet, every light fitting, all glass, window tracks and floor drains — cleaned to the standard a handover demands, with no shortcuts taken to hit a price.
2. Defect Photo Log
As we clean, the team photographs items needing builder attention: incomplete grout, paint touch-ups, tile chips, faulty hardware, non-functioning fittings. You get a clear, dated WhatsApp record.
3. Builder Snag Window
Booked ideally 2–3 days before handover, the report gives your contractor time to correct snags before the owner arrives — not after they've formed a first impression.
4. Re-Clean & Staging
A light re-clean of any surfaces disturbed by snag fixes, plus optional staging for handover photography or a formal owner inspection.
Handover Cleaning Prices
Guide ranges in IDR; quoted on WhatsApp after a walkthrough. Full detail on the pricing page.
| Service | Guide Price (IDR) | Notes |
|---|---|---|
| Pre-handover clean + defect report | 1,800,000–4,000,000 | Scaled to property size |
| Re-clean before occupation | 400,000–800,000 | Light dust removal pre-arrival |
For developers running multiple units, pair this with villa post-build cleaning and commercial pre-opening. Owners can also use our new-villa inspection checklist to know what to look for at handover.
Frequently Asked Questions
Do you provide defect documentation as part of handover cleaning?
Yes — defect documentation is a standard output of all pre-handover cleaning engagements. We photograph any items requiring builder attention before handover: paint touch-ups, incomplete grout, tile chips, hardware issues, non-functioning items. Delivered as a WhatsApp photo report alongside the cleaning completion confirmation.
How long before handover should we schedule the clean?
Ideally 2–3 days before the planned handover date. This allows time for any builder snagging items identified during the clean to be addressed, and a light re-clean of any surfaces disturbed by the snag fixes before the owner arrives.
Property Near Handover?
Tell us the property size and target handover date. We'll schedule to meet it with the right team size.